What we do

Six jobs, and what each one actually involves.

Structure for people’s houses, and nothing else.

  • Fixed fee, confirmed in writing before we start.
  • We reply within one working day.

We work from your drawings and photos anywhere in England, with a site visit where the job needs one.

One house, six jobs

Same house. Six different jobs.

Skip to the finished picture

Illustrative image

Take a wall out

A beam that carries whatever the wall was holding up.

You get
Calculations and drawings for the beam and for the props holding the house up.
We need
Plans, and photographs of both sides of the wall and the ceiling.
The thing people miss
What sits above the wall decides everything.

How it works, step by stepStart with this

JOIST ENDSthey run away from youFLUSH BEAM, END ONinside the floor depthLOAD PATH
Illustrative image

Extend

The structure for the extension, and for the opening into the house.

You get
Foundations, the beam over the opening and its props, and the calculations behind them.
We need
Plans, elevations, a section, and photographs of the back of the house.
The thing people miss
Large trees near a clay site change the foundation.

Extensions, in depthStart with this

NEW BEAM, END ONit runs away from youNEW EXTENSIONWALL OPENS UP
Illustrative image

Convert the loft

A floor that can carry a bedroom, and a new way of holding the roof up.

You get
Floor and roof design, the new beams, and the connections to the old structure.
We need
Plans, a section, and photographs inside the roof space.
The thing people miss
Trussed rafters mean the roof is restructured, not simply floored over.

Converting a loft, step by stepStart with this

NEW FLOORjoists beside the oldceiling, not on itSTEEL PURLINSone way of severalRIDGE BEAMinto the page, on padstonesDORMERruns the full widthOLD FOOTINGSconfirm on site
Illustrative image

Check a crack

A plain answer: is it structural, what is causing it, and what to do.

You get
A written opinion in plain English. If the honest answer is to watch it, we say so.
We need
Photographs with something for scale, and when you first noticed it.
The thing people miss
When it appeared matters as much as how wide it is.

Start with this

CRACKmeasured, then monitored
Illustrative image

Build a new house

The whole structure for one house, from the foundations to the roof.

You get
A complete structural package, coordinated with your architect.
We need
The architect’s full set, and any site investigation that has been done.
The thing people miss
The ground is the first decision, not the last.

Start with this

LOAD PATHSFOUNDATIONS
Illustrative image

Add a basement

A new room under a house that is already standing.

You get
The retaining walls, floors and slab, the props and dig order, and their drawings.
We need
Plans, a section, and what you know about the ground and water.
The thing people miss
The house above is carried all the way down, internal walls too, and the new walls hold back soil and water.

A basement usually needs Party Wall notice (when, and how long before).

Start with this

NEW SUSPENDED FLOORit and the slab prop the walls for goodRETAINING WALLSthey hold the ground backWALLS CARRIED DOWNunder the walls aboveWATER PRESSUREthe slab stops it lifting
Illustrative image

What you get

One package, three places it goes.

YOUR STRUCTURAL PACKAGE CALCULATIONS DRAWINGS ANSWERS TO BUILDING CONTROL’S QUESTIONS BUILDING CONTROL YOUR BUILDER We answer Building Control’s questions on our calculations as part of the job. YOUR STRUCTURAL PACKAGE CALCULATIONS DRAWINGS ANSWERS TO BUILDING CONTROL BUILDING CONTROL YOUR BUILDER We answer Building Control’s questions on our calculations as part of the job.
Calculations and drawings your builder can build from, and Building Control can check.

Steel is paid for by the kilo. What closes at each stage.

And more.

Six is the list, not the limit. If it is a house and it is structural, it is probably something we do.

Tell us what it is

We do party wall surveys, for either side or both

Work to a party structure needs at least two months’ notice. A dig within 3 m of next door and below its foundations, or within 6 m and through a 45° line drawn down from them, needs at least one month. If you and next door disagree, a party wall award settles it.

Source: Party Wall etc. Act 1996, sections 3, 6, and 10. General information, not advice on your situation.

Honestly

What we don’t do.

  • Commercial buildings.
  • Developer schemes. We design houses one at a time.
  • The parts that are not structure. Drainage, thermal performance, and planning applications.

How we use AI

It reads. It does not decide.

What AI does

Reading text off drawings95%

What it does not do

Counting doors39%
Counting windows34%

Best in class.

We use AI to read drawings and organise paperwork. It never sizes, counts or decides. Every structural number comes from an engineer.

Source: AECV-Bench, AEC Foundry. Third-party results about AI models in general. The codes we design to

Not sure which of those you need?

Tell us about the house and the plan, and we will tell you. We reply within one working day.