Why early
Almost everything is still open, until it quietly isn’t.
Structure is usually drawn heavier than it needs to be. The chances to make it lighter close one decision at a time.
The roof presses down.
One beam carries it across the doors.
A padstone under each end.
Down a pier each side.
Into a foundation, then the ground.
This whole route decides how heavy the beam must be.
The habit
A bigger beam is quicker to design, and nobody ever complains about one.
Over-specification is rarely carelessness. Re-Structured, a practice that writes openly about it, lists why.
- 01Not enough time
- 02Working outside their specialism
- 03Risk aversion late in a career
- 04Inexperience early in one
- 05Fear of an insurance claim
- 06Working to obsolete standards
- 07Poor software (spreadsheets)
- 08No review systems
Source: Re-Structured.
“when the excess is say only 20%, it can easily be missed”
Re-Structured
Source: Build It, “Structural Costs & How to Save Money on Structural Engineering”, case by Re-Structured. A third party’s figures, about a third party’s project.
Diagram drawn for this demo. The arithmetic is the source’s, not ours.
The knock-on effect
A heavier beam is never just a heavier beam.
Steel gets priced, but the cost does not stop there. and the load reaches everything under it. and every part below has less to carry.
Illustrative. Not a calculation and not a design.
Key to the drawings
- Existing masonry A flat tone: everything already there, cut or seen.
- Concrete Aggregate triangles and fine dots, scattered at random: foundations, slabs, padstones, lean-mix cavity fill, encasement.
- Undisturbed ground Basket weave, as a band that follows the ground line and fades out.
- Load path Where the load goes, from the roof to the ground; dashed where it runs beyond the cut.
- Load marks Arrows at the symbol weight: loads down onto a member, bearing up under a foundation.
- Hidden, beyond or removed Out of the cut, beyond it, or taken out.
- Cloud Confirm on site. Never a revision mark.
- Break line The drawing stops; the building does not.
Lean
Same safety, same codes, less waste.
- 01The rules do not move.
- 02The margin does.
- 03Somebody reads it afterwards.
Illustrative. Both meet the codes, safety factors included.
Lean never means unsafe
If a member needs to be heavy, we draw it heavy and tell you why. Every design we issue meets the Building Regulations. We answer Building Control’s questions on our calculations as part of the job.
Where you are
What is still open, and what has already closed.
Five things decide what a structure costs. They close at different times.
Just an idea
Nothing is drawn, so nothing is fixed yet. A change is a conversation.
Talking to an architect
Almost everything is still open. This is the best moment to call.
Drawings are being done
The layout is settling. Spans, openings and structure are still ours to shape.
Planning application in
The layout is with the planners. What holds it up is still open.
Planning granted
The outside is fixed. The structural decisions inside it, the expensive ones, are still open.
Out to builders for prices
Sizes are still open, and sizes are where most of the weight sits.
On site
Most decisions are made. We can still help, and quickly. Once the steel is ordered, the only thing left to save is your patience.
Drawn for this demo. Not a design.
| Stage | Layout | Openings and spans | Structural approach | Foundations | Member sizes |
|---|---|---|---|---|---|
| Just an idea | Open | Open | Open | Open | Open |
| Talking to an architect | Open | Open | Open | Open | Open |
| Drawings are being done | Closing | Open | Open | Open | Open |
| Planning application in | Fixed | Closing | Open | Open | Open |
| Planning granted | Fixed | Fixed | Open | Open | Open |
| Out to builders for prices | Fixed | Fixed | Closing | Closing | Open |
| On site | Fixed | Fixed | Fixed | Fixed | Closing |
Your duties
On your own house, you are the client, and that comes with duties.
“A domestic client is any individual who has building work carried out on their home, or the home of a family member.”
GOV.UK, “Design and building work: meeting building requirements”
A domestic client
- “allocate enough time and resource for the building work to comply with building regulations”
- “appoint designers and contractors”
- “co-operate with anyone working on, or in relation to the project”
Source: GOV.UK, as above. Part 2A of the Building Regulations 2010, in force from 1 October 2023.
Time is the raw material a lean structure is made from. Appoint the structure early, with room for a review.
The earlier we are involved, the more of your structure is still worth optimising.
Tell us where you are up to. We reply within one working day.