For homeowners, builders and architects

Structural calculations and drawings for Building Control

For a steel beam, a chimney breast, a loft or an extension: the calculations Building Control checks, and drawings your builder can build from.

When does Building Control need structural calculations?

Part A of the Building Regulations 2010 is the structure requirement: a building has to carry its loads safely to the ground, stay stable when the ground swells, shrinks or subsides, and not collapse out of proportion to an accident. Approved Document A is the government’s statutory guidance on it.

Taking out a wall that carries load, or a chimney breast that carries anything, is a material alteration, because at some stage it would leave the house short of Part A. Loft conversions and extensions are building work too. Building Control has to see all of it, and for a beam they ask for calculations for the beam and its bearings.

Sources: The Building Regulations 2010 (England), regulation 3 and Schedule 1, Part A; GOV.UK, “Structure: Approved Document A”.

Common jobs, each with a note of its own:

Full plans or a building notice?

The calculations are the same either way. With the council, you apply with full plans, checked before work starts, or give a building notice and are inspected as you go. A private building control firm works through an initial notice instead. On a building notice the council can still ask, in writing, for the plans it needs to check the work.

Sources: The Building Regulations 2010 (England), regulations 12 and 13; Building Act 1984, section 47.

What is in the pack?

  • Calculations for each beam and its bearings: the padstones, the walls and foundations under each end, how the beam is held sideways, and how the steel is protected from fire.
  • Drawings your builder can build from: a structural plan and a section, showing where each beam sits, what it bears on, and its padstones.
  • Sizes: every beam’s steel section and every padstone, worked out by calculation.
  • Connections: where the new structure meets the old.
  • Temporary works, where the job needs them: the props and needles that hold the house up while a wall comes out, and the order they go in and come out. Your builder puts them in to our drawing and keeps them tight. We check every temporary works design before it is issued.
  • Answers: we answer Building Control’s questions on our calculations as part of the job.

Every design we do meets the Building Regulations.

What the calculations follow, from the beam down. The beam (B1) and its padstones (P1) are sized by calculation, and the pier and foundation under each end must take the load too. The cloud marks what is confirmed on site.

Diagram drawn for this site. Not to scale, and not a design.

Key to the drawings
  • Existing masonry A flat tone: everything already there, cut or seen.
  • Concrete Aggregate triangles and fine dots, scattered at random: foundations, slabs, padstones, lean-mix cavity fill, encasement.
  • Undisturbed ground Basket weave, as a band that follows the ground line and fades out.
  • Load path Where the load goes, from the roof to the ground; dashed where it runs beyond the cut.
  • Load marks Arrows at the symbol weight: loads down onto a member, bearing up under a foundation.
  • Hidden, beyond or removed Out of the cut, beyond it, or taken out.
  • Cloud Confirm on site. Never a revision mark.
  • Break line The drawing stops; the building does not.

What do we need from you?

  • Drawings if you have them. If not, floor plans or a sketch with the main measurements.
  • Photographs: both sides of the wall and the ceiling above it, inside the roof space for a loft, the back of the house for an extension.
  • Roughly when the house was built, and whether it is terraced, semi-detached or detached.
  • What is above the work (another wall, a bathroom, a water tank, a roof strut), and which way the floorboards run up there.
  • For an extension, where the big trees are, yours and next door’s.

Do you need to visit the house?

Most jobs start from what you send, and we work from drawings and photographs anywhere in England. When a job needs a visit, we say so before we start, and we visit homes across London, Surrey and Sussex. On the day we look at what the design depends on: which way the joists run, what stands on the wall, and what it all comes down onto. How a site visit works.

What does it cost, and when will it be ready?

  • We reply within one working day.
  • Fixed fee, confirmed in writing before we start.
  • We answer Building Control’s questions on our calculations as part of the job.

The written fee also gives the date you will have the calculations and drawings. How our fees work.

Why does a lean design matter?

Steel is bought by the kilo, so a beam heavier than it needs to be costs more to buy and to carry through the house. And a load overstated at the top is carried all the way down, through the padstones, the piers and the foundations. We size each member for what it actually carries. If one needs to be heavy, we draw it heavy and tell you why.

Lean means taking the waste out, not the safety. The earlier we see the plan, the more of the structure is still worth optimising: a slightly narrower opening can change the answer. Steel is paid for by the kilo, and why we ask you to call early.

Architect or builder? Send us a set.

Send a set

Send us the drawings before anybody orders steel.

We reply within one working day. Fixed fee, confirmed in writing before we start.

Or call 01483 363308: Monday to Friday 9am to 5pm, Saturday 9am to noon.