Fees

What a structural engineer costs, and how our fees work

A guide to fees for the jobs we do most, what moves a fee within its range, and what the fixed fee covers. Every job has its own written quote.

Fees, as a guide

Each is for one house, and a guide only: every job has its own written quote. Where your job sits in its range depends on the things listed below.

A guide, November 2026. Your fee is the one in your written quote, with no VAT to add.
JobAs a guide
Taking out a wall: one opening, one beam£550 to £800
Removing a chimney breast£450 to £750
Single-storey rear or side extension£950 to £1,600
Loft conversion£1,300 to £2,200
Two-storey or wrap-around extension£1,800 to £2,500
Structural approach report, before the calculationsTaken off the design fee if you go ahead with us£300
Structural inspection, with a written report£550 to £950
Basements and new housesQuoted for each project

Party wall surveys

We do party wall surveys, for either side or both. Each figure is for one neighbour, on a loft or an extension.

A guide for each neighbour, October 2026. Your fee is the one in your written quote.
Our roleAs a guide
Surveyor for the owner doing the work£1,200 to £1,500
Surveyor for a neighbour£1,200 to £1,500
Agreed surveyor, for both£1,200 to £1,500
Schedule of condition: a dated record of next door before work startsIncluded in the surveyor’s fee
BasementsQuoted for each project

The party wall award says who pays the surveyors’ fees. Usually it is the owner doing the work, including the fee of the neighbour’s surveyor.

Sources: Party Wall etc. Act 1996, section 10(13); HomeOwners Alliance, “Party wall surveyor costs”. A schedule of condition is practice, not something the Act requires.

What moves a fee within its range?

  • The span. A wider opening needs a bigger beam, and more checking of what each end bears on.
  • What sits above. A wall that carries a floor, another wall and part of the roof takes more working out than one that carries a ceiling.
  • The ground. New foundations on clay near trees, or close to next door’s, take more design than foundations on sound ground. The ground here.
  • Your drawings. A full set of plans and a section leaves less for us to establish than a sketch and photographs.
  • Where the house is. When a job needs a visit, how far the house is from us, within the area we visit.

What does the fixed fee include?

  • Calculations, and drawings your builder can build from and Building Control can check.
  • Where a wall comes out or an opening is made, the design of the props that hold the house up while it is done.
  • We answer Building Control’s questions on our calculations as part of the job.
  • A site visit, where the job needs one. We agree it with you before we quote, and it is part of the fixed fee.
  • Minor changes to the design.

What costs extra?

  • A major change to the design after you have approved it. Minor changes are included.
  • Visits beyond those agreed in the written fee.

We tell you the cost of either before we do it. Not in our fee at all: Building Control’s own charges, and the builder’s work, including any opening up, such as a trial hole.

How is the fee agreed, and when do I pay?

Fixed fee, confirmed in writing before we start. The same letter gives the date you will have the calculations and drawings, and everything we have agreed. Nothing starts before you have it.

You pay half the fee before we start, and the rest when the work is complete.

Can I cancel?

If the job is for your own home and you agree it with us by email, by phone or at your home, you can cancel without giving a reason until the end of 14 days after the day you agree it. We start within those 14 days only if you ask us to. If you then cancel, you pay for the work done up to the time you tell us, and anything you have paid beyond that comes back to you within 14 days.

Source: The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, regulations 29, 30, 34 and 36.

Why not the cheapest calculation?

The fee is a small part of what a structure costs to build. Steel is paid for by the kilo, so time spent designing it lean can save more on the build than any difference in fee. Lean never means unsafe: every design we do meets the Building Regulations.

One published case: on a £50,000 rear extension, a design review identified overdesign that saved 700 kg of steel. At £5 per kg, that is a £3,500 build cost saving.

Source: Build It, “Structural Costs & How to Save Money on Structural Engineering”, case by Re-Structured. A third party’s figures about a third party’s project, not a saving we promise.

How steel weight becomes money, and why it pays to ask early.

Tell us what you are planning, and we will tell you the fee.

We reply within one working day. Fixed fee, confirmed in writing before we start.

Or call 01483 363308: Monday to Friday 9am to 5pm, Saturday 9am to noon.