What we do
Party wall surveys, for either side or both
Notices, schedules of condition and awards under the Party Wall etc. Act 1996, for homes across London, Surrey and Sussex, from Guildford to Brighton.
Illustrative image
Which side of the wall are you on?
- Having the work done. We prepare your notices and serve them for you. If next door consents in writing, no surveyor is needed. If not, we act as your surveyor.
- Received a notice. We act as your surveyor. You do not need anyone to reply for you, but reply in writing within 14 days: to a notice about a party wall or a dig, silence counts as a dispute.
- Both of you. You can agree on one surveyor, the agreed surveyor, who makes one award for both. We act in that role too.
Whoever appoints us, a surveyor under the Act weighs both owners’ rights and draws up the award impartially.
Sources: Party Wall etc. Act 1996, sections 5, 6(7) and 10(1); GOV.UK, “The Party Wall etc Act 1996: explanatory booklet”, paragraphs 12, 33 and 53.
Do I need a party wall agreement?
You must serve notice if the work is one of three kinds, on every owner of the property next door, before anything starts.
- A new wall on the boundary (section 1). Astride the line, or wholly on your side of it. At least one month’s notice.
- Work to a party wall (section 2). Cutting in for a beam’s bearing or a loft’s steels, underpinning or raising it, or taking a chimney breast off it. At least two months’ notice, even when the work stays in your half.
- Digging near next door (section 6). Within 3 m of their building and deeper than its foundations, or within 6 m and reaching a line drawn down at 45° from the bottom of them. At least one month’s notice, with plans and sections of the dig.
A masonry garden wall astride the boundary counts; a timber fence does not. Plastering, rewiring or putting up shelves usually needs no notice. A notice lapses if the work has not begun within a year of serving it.
Sources: Party Wall etc. Act 1996, sections 1, 2, 3 and 6; GOV.UK, “Party walls and building work”; explanatory booklet, paragraphs 1, 3, 6, 9, 23 and 29.
Source: Party Wall etc. Act 1996, sections 2(2)(f), 3(2)(a), 6(1), 6(2) and 6(5). Diagram drawn for this site. Not a design.
What happens after the notice?
- Within 14 days, next door replies in writing. For work to a party wall or a dig, if they have not consented by then, a dispute is deemed to have arisen.
- For a wall astride the boundary, without their written consent in those 14 days you may build only wholly on your own land, at your own expense.
- On a dispute, the owners agree on one surveyor, or each appoint their own and the two select a third, who settles any disputed matter that either owner or either surveyor refers to them. You cannot be your own surveyor.
- If next door appoints no one within ten days of a request served on them, you can appoint a surveyor for them.
- The award settles what is in dispute, and the work goes ahead under it.
Next door cannot stop work the Act allows, but can affect how and when it is done. Consent does not end your duties: avoid unnecessary inconvenience, and put right or pay for any damage.
Sources: Party Wall etc. Act 1996, sections 1(4), 5, 6(7), 7 and 10; GOV.UK, “Party walls and building work”.
What is a party wall award?
A legal document, made by the surveyor or surveyors, that settles what is in dispute. It can decide whether the work may be done, when and how, and anything arising from it, including the cost of making the award. It often records next door’s condition before work starts, and lets the surveyors inspect the work. Either owner can appeal to the county court within 14 days of being served with it: take legal advice before you do.
Sources: Party Wall etc. Act 1996, section 10(10), (12) and (17); explanatory booklet, paragraphs 14 and 17.
What is a schedule of condition?
A record, in words and photographs, of next door’s walls, floors, ceilings and anything else the work could affect, made before it starts. If a crack appears later, it shows whether the crack was there before. The Act does not require one; the government’s booklet calls it “most prudent”. We make one as part of the award, or on its own where next door has consented.
Source: explanatory booklet, paragraph 14 and Appendix 1.
Who pays the surveyors?
The Act leaves it to the surveyor or surveyors making the award to decide who pays its reasonable costs, and those of inspecting the work. Usually that is the owner having the work done, next door’s surveyor included, where the work is only for their benefit. Next door may pay a share where the work is needed because of a defect or disrepair. Our own fee is fixed, and confirmed in writing before we start.
Sources: Party Wall etc. Act 1996, section 10(13); explanatory booklet, paragraph 15.
How does it fit with the structure we design?
Much of the work we design reaches the Act. A beam that bears in a party wall stops in your half, never through it, and still needs two months’ notice. A new foundation beside next door, taken deeper for clay or trees, can need one month’s. The notice must describe the work and, for a dig, come with plans and sections showing where it is and how deep. Those are our drawings, so the notice comes from the same set. Serve it at the start of the programme, not the week the builder arrives. Our sample report sets this out for an invented semi with two extensions.
Sources: Party Wall etc. Act 1996, sections 3(1) and 6(6).
When should you take legal advice?
This page explains the Act; it is not legal advice on your situation. Surveyors cannot settle where the boundary runs, so if that is in doubt, take a solicitor’s advice. Do the same before appealing an award, or if work has started next door without notice.
Source: explanatory booklet, paragraphs 17, 26, 35 and 43.
What we need from you
- Whether you are having the work done or have received a notice, with a copy of any notice.
- Your drawings, or a sketch and photographs of the work and the wall.
- The address, and which neighbours the work is near.
- The names of everyone who owns your house: a notice names them all.
- When the builder hopes to start.