Standards

The rules we work to, named.

Every designation on this page was checked against the publisher’s own catalogue on 21 September 2026. How to treat that date.

The law

Three requirements in England and Wales.

Scotland and Northern Ireland word theirs differently.

  1. Every load, to the ground.

    A1

    Loading

    “The building shall be constructed so that the combined dead, imposed and wind loads are sustained and transmitted by it to the ground—(a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.”

    “In assessing whether a building complies with sub-paragraph (1) regard shall be had to the imposed and wind loads to which it is likely to be subjected in the ordinary course of its use for the purpose for which it is intended.”

  2. The top band moves; footings go deeper.

    A2

    Ground movement

    “The building shall be constructed so that ground movement caused by—(a) swelling, shrinkage or freezing of the subsoil; or (b) land-slip or subsidence (other than subsidence arising from shrinkage), in so far as the risk can be reasonably foreseen, will not impair the stability of any part of the building.”

  3. A piece of wall lost; the load goes round, and down.

    A3

    Disproportionate collapse

    “The building shall be constructed so that in the event of an accident the building will not suffer collapse to an extent disproportionate to the cause.”

Key to the drawings
  • Existing masonry A flat tone: everything already there, cut or seen.
  • Brickwork, new Single diagonal hatch. The outer leaf, and new brickwork in elevation.
  • Blockwork, new Cross-hatch, so it can never be read as brick beside it.
  • Concrete Aggregate triangles and fine dots, scattered at random: foundations, slabs, padstones, lean-mix cavity fill, encasement.
  • Undisturbed ground Basket weave, as a band that follows the ground line and fades out.
  • Hardcore Large open zigzag, the depth of its own layer.
  • Insulation board The looped line, touching both faces, inside the board outline.
  • Timber, cut A box with a cross. Seen along its length, an outline only.
  • Steel, cut Solid, at the section's true proportion.
  • DPC Heavy dashed line, as Approved Document C draws it.
  • Membrane, tray Heavy solid line: DPM, cavity tray, roof membrane.
  • Load path Where the load goes, from the roof to the ground; dashed where it runs beyond the cut.
  • Load marks Arrows at the symbol weight: loads down onto a member, bearing up under a foundation.
  • Hidden, beyond or removed Out of the cut, beyond it, or taken out.
  • Cloud Confirm on site. Never a revision mark.
  • Break line The drawing stops; the building does not.

Source: The Building Regulations 2010 (SI 2010/2214), Schedule 1, Part A. Quoted in full. Crown copyright, Open Government Licence v3.0. Read Schedule 1 on legislation.gov.uk.

Guidance is not the same thing as law.

Approved Document A says so itself: “there may well be alternative ways of achieving compliance with the requirements. Thus there is no obligation to adopt any particular solution contained in an Approved Document if you prefer to meet the relevant requirement in some other way.”

Source: Approved Document A, Use of guidance. Crown copyright, Open Government Licence v3.0.

Four regimes

The guidance changes at the border. The physics does not.

Approved Document A carries its own footnote: it “gives guidance for compliance with the Building Regulations for building work carried out in England”.

Where is the house?

England

The regulationsThe Building Regulations 2010 (SI 2010/2214)

The structural guidanceApproved Document A: structure, 2004 edition

the border

Scotland

The regulationsThe Building (Scotland) Regulations 2004 (SSI 2004/406)

The structural guidanceBuilding standards technical handbook: domestic, April 2026 edition

The design standards: Eurocodes with their UK National Annexes.

The same on both sides.

The documents change. The physics does not.

The four regimes.
Where the house isThe regulationsThe structural guidance
EnglandThe Building Regulations 2010 (SI 2010/2214)Approved Document A: structure. The 2004 edition incorporating the 2004, 2010 and 2013 amendments. Its cover reads “For use in England”.
WalesThe Building Regulations 2010 (SI 2010/2214)Approved Document A: structure, published by the Welsh Government. The 2004 edition incorporating the 2010 amendments. It is not the England document: the 2013 amendments say on their own first page that they apply only to England, and this edition does not carry them.
ScotlandThe Building (Scotland) Regulations 2004 (SSI 2004/406)Building standards technical handbook: domestic, published by the Scottish Government. The April 2026 edition, which applies to a building warrant submitted on or after 6 April 2026.
Northern IrelandThe Building Regulations (Northern Ireland) 2012 (SR 2012 No. 192)Technical Booklet D, Structure, October 2012. The amendment booklets published since then cover other parts, not Part D.

All four are free to read. Sources: legislation.gov.uk, gov.uk, gov.wales, gov.scot and buildingcontrol-ni.com, each checked on 21 September 2026.

The load

Follow the load down.

In the order the weight travels.

Skip to the finished picture
the roofrafters and strutsinto the pagejoists land out of viewouter wallroof and wind, downbeam, end onbears out of viewfoundationsone under each wallthen the groundevery path ends here

Not to scale; not a design.

6 of 17 standards

The roof

Rafters and struts hand the roof to the walls.

  • BS EN 1990 the rules of every check
  • BS EN 1991-1-1 the weight of the house
  • BS EN 1991-1-3 snow
  • BS EN 1991-1-4 wind
  • BS EN 1995-1-1 timber
  • BS 8103-3 timber, for housing

4 of 17 standards

The first floor

Joists run into the page, to walls beyond this cut.

  • BS EN 1995-1-1 timber
  • BS 8103-3 timber floors, for housing

With: BS EN 1990, BS EN 1991-1-1

8 of 17 standards

The outer wall

Masonry carries it down and steadies the house against wind.

  • BS EN 1991-1-7 accidents
  • BS EN 1996-1-1 masonry
  • BS EN 1996-2 building masonry
  • BS 8103-2 masonry, for housing

With: BS EN 1990, BS EN 1991-1-1, BS EN 1991-1-4, BS 8103-1

7 of 17 standards

The opening and its beam

A flush steel beam, end on here, takes the wall above. It bears out of view.

  • BS EN 1993-1-1 steel

With: BS EN 1990, BS EN 1991-1-1, BS EN 1991-1-7, BS EN 1992-1-1, BS EN 1996-1-1

We design the propping too: BS 5975-2, with BS 5975-1 on site.

5 of 17 standards

The foundation

Each wall stands on its own strip.

  • BS EN 1997-1 the ground
  • BS EN 1992-1-1 concrete
  • BS 8103-1 foundations, for housing

With: BS EN 1990, BS EN 1991-1-1

4 of 17 standards

The ground

Every load ends here.

  • BS EN 1997-2 ground investigation

With: BS EN 1990, BS EN 1997-1, BS 8103-1

BS EN 1993-1-1

:2005+A1:2014

part number: does not changeedition: a fact about a date

The steel standard’s designation split in two: the part number on top, the dated edition underneath.

Part numbers on top, editions underneath

Both Eurocode generations sit in the catalogue as current, so we name the part number, with the edition we checked underneath.

Design standards

The standards we design to, as they are published.

The last group is temporary works: the propping we design.

BRITISH STANDARDS withdrawn EUROCODES with UK National Annexes 31 March 2010 1 April 2010 Source: Approved Document A, British Standards. Crown copyright.
One day to the next.

“The British Standards Institution notified the British Standards for structural design referenced in the 2004 edition of this Approved Document as withdrawn on 31 March 2010. British Standards for structural design based upon the Eurocodes were correspondingly implemented by the British Standards Institution on 1 April 2010 and it is these standards with their UK National Annexes which are now referenced in this Approved Document as practical guidance on meeting Part A requirements.”

Approved Document A, British Standards. Crown copyright, Open Government Licence v3.0.

Basis of design

The common rules the other standards sit on.

  • BS EN 1990

    with its UK National Annex

    Eurocode. Basis of structural design.

    What counts as a load case, what factors are applied to it, and what the structure is then checked against. It is the reason a beam is checked twice: once for whether it is strong enough, and once for how far it bends.

    Edition checked: BS EN 1990:2002+A1:2005

    National Annex: NA to BS EN 1990:2002+A1:2005

The loads

Where the numbers on the left-hand side of every calculation come from.

  • BS EN 1991-1-1

    with its UK National Annex

    Eurocode 1. Actions on structures. General actions. Densities, self-weight, imposed loads for buildings.

    The weight of the building itself, and the weight of everything put into it afterwards. This is the starting point for sizing any beam in a house.

    Edition checked: BS EN 1991-1-1:2002

    National Annex: NA to BS EN 1991-1-1:2002

  • BS EN 1991-1-3

    with its UK National Annex

    Eurocode 1. Actions on structures. General actions. Snow loads.

    Snow sitting on a roof is a load like any other. It matters for a loft conversion, for a re-roof and for a flat-roofed extension tucked under a taller wall.

    Edition checked: BS EN 1991-1-3:2003+A1:2015

    National Annex: NA+A2:18 to BS EN 1991-1-3:2003+A1:2015

  • BS EN 1991-1-4

    with its UK National Annex

    Eurocode 1. Actions on structures. General actions. Wind actions.

    Wind pushes on a house and it also lifts. Where the house stands, how exposed it is and how tall it is all change the answer, which is why a gable on an open hillside is not the same problem as the same gable mid-terrace.

    Edition checked: BS EN 1991-1-4:2005+A1:2010

    National Annex: NA to BS EN 1991-1-4:2005+A1:2010

  • BS EN 1991-1-7

    with its UK National Annex

    Eurocode 1. Actions on structures. General actions. Accidental actions.

    Requirement A3 is the one about a building not collapsing out of all proportion to an accident. Approved Document A points to the annexes of this standard for further guidance on it.

    Edition checked: BS EN 1991-1-7:2006+A1:2014

    National Annex: NA+A1:2014 to BS EN 1991-1-7:2006+A1:2014

The materials

One standard per material, and a house usually touches several at once.

  • BS EN 1992-1-1

    with its UK National Annex

    Eurocode 2. Design of concrete structures. General rules and rules for buildings.

    Foundations, ground beams, a reinforced concrete lintel, the slab under a new extension.

    Edition checked: BS EN 1992-1-1:2004+A1:2014

    National Annex: NA+A2:14 to BS EN 1992-1-1:2004+A1:2014

  • BS EN 1993-1-1

    with its UK National Annex

    Eurocode 3. Design of steel structures. General rules and rules for buildings.

    The steel beam that replaces a wall, and the posts and padstones it lands on. This is the standard behind the section size written on the drawing.

    Edition checked: BS EN 1993-1-1:2005+A1:2014

    National Annex: NA+A1:2014 to BS EN 1993-1-1:2005+A1:14

  • BS EN 1995-1-1

    with its UK National Annex

    Eurocode 5. Design of timber structures. General. Common rules and rules for buildings.

    Joists, rafters, trimmers around a new stair opening, and the new floor that goes into a loft.

    Edition checked: BS EN 1995-1-1:2004+A2:2014

    National Annex: NA to BS EN 1995-1-1:2004+A2:2014

    Approved Document A still lists the +A1:2008 amendment, because its own list was frozen in 2013.

  • BS EN 1996-1-1

    with its UK National Annex

    Eurocode 6. Design of masonry structures. General rules for reinforced and unreinforced masonry structures.

    The brick and block walls already carrying the house, and the piers a new beam is about to land on. Most of a house is masonry, so most of a house is this.

    Edition checked: BS EN 1996-1-1:2005+A1:2012

    National Annex: NA to BS EN 1996-1-1:2005+A1:2012

  • BS EN 1996-2

    with its UK National Annex

    Eurocode 6. Design of masonry structures. Design considerations, selection of materials and execution of masonry.

    The buildable half of masonry design: what the wall is made of, and how it has to be built for the design to mean anything.

    Edition checked: BS EN 1996-2:2006

    National Annex: NA to BS EN 1996-2:2006

The ground

Requirement A2 is about ground movement, and this is where that gets designed.

  • BS EN 1997-1

    with its UK National Annex

    Eurocode 7. Geotechnical design. General rules.

    What the ground under a foundation can carry, and what it does when it dries out, wets up or freezes. Foundation width and depth both land here.

    Edition checked: BS EN 1997-1:2004+A1:2013

    National Annex: NA+A2:2022 to BS EN 1997-1:2004+A1:2013

    This is the clearest example on the page of an annex moving on its own: the previous annex was withdrawn on 28 February 2022 while the standard it belongs to stayed put.

  • BS EN 1997-2

    with its UK National Annex

    Eurocode 7. Geotechnical design. Ground investigation and testing.

    How you find out what the ground is, rather than assuming it. Trial holes, boreholes and soil testing.

    Edition checked: BS EN 1997-2:2007

    National Annex: NA to BS EN 1997-2:2007

Written for housing

A house is not a small office block, and these three are written for houses.

  • BS 8103-1

    Structural design of low-rise buildings. Code of practice for stability, site investigation, foundations, precast concrete floors and ground floor slabs for housing.

    Holding a house steady sideways, and what goes on underneath it.

    Edition checked: BS 8103-1:2011.

  • BS 8103-2

    Structural design of low-rise buildings. Code of practice for masonry walls for housing.

    The walls, at housing scale rather than general masonry scale.

    Edition checked: BS 8103-2:2013

    Approved Document A still lists the 2005 edition, for the same reason as the timber standard above.

  • BS 8103-3

    Structural design of low-rise buildings. Code of practice for timber floors and roofs for housing.

    Floors and roofs in timber, which is nearly every floor and roof in a British house.

    Edition checked: BS 8103-3:2009.

Getting it built

The structure that holds the house up while the permanent structure is not there yet. Propping and needling while a wall comes out is temporary works. We design it; the builder puts it in, keeps it right and takes it out. At the end of 2024 one code of practice became two.

  • BS 5975-1

    Temporary works. Management procedures for the control of temporary works. Code of practice.

    Who is responsible for the temporary structure, who checks it, and the procedure it goes through before anyone relies on it.

    Edition checked: BS 5975-1:2024.

  • BS 5975-2

    Temporary works. Falsework: design and implementation. Code of practice.

    The design side of temporary works: written for falsework, and BSI says it “can be applied to the design of other temporary works”.

    Edition checked: BS 5975-2:2024.

These two replaced BS 5975:2019, which BSI withdrew on 18 December 2024 and split into the management part and the design part.

Free, and bought

Free: the law and the government guidance, at the links given. Bought: every BS and BS EN document and National Annex, from BSI. We reproduce none of their text.

How to treat this list

Checked by hand on 21 September 2026.

One clause

This is where a structural answer comes from.

Four minimums, not four answers.

“Except where strip foundations are founded on rock, the strip foundations should have a minimum depth of 0.45m to their underside to avoid the action of frost. This depth, however, will commonly need to be increased in areas subject to long periods of frost or in order to transfer the loading onto satisfactory ground.”

“The depth to the underside of foundations on clay soils should not be less than 0.75m on low shrinkage clay soils, 0.9m on medium shrinkage clay soils and 1.0m on high shrinkage clay soils, although these depths may need to be increased in order to transfer the loading onto satisfactory ground, or where there are trees nearby.”

Approved Document A, paragraph 2E4

Quoted verbatim. Crown copyright, Open Government Licence v3.0.

Foundation depth, the long version

Statutory

Three more that catch families out.

Party Wall notice periods, to scale.

Party Wall etc. Act 1996

1996 c. 40. Notice periods, to scale above, for work to a shared wall, or a dig below next door’s foundations within 3 m, or through a 45° line from them within 6 m.

Read the Act

The Construction (Design and Management) Regulations 2015

SI 2015/51. The health and safety regime over the whole project, a private house included, and where the CDM roles of client, designer, principal designer and principal contractor come from.

Read the Regulations

Building Regulations Part 2A

In England since 1 October 2023, with its own principal designer, separate from CDM’s. Where more than one contractor is, or will foreseeably be, involved and a family appoints none, “the designer in control of the design phase of the project is the principal designer”.

Source: SI 2010/2214, regulations 11C(2) and 11D(1).

Read Part 2A

Architect or builder? Send us a set.

You will get the standards named on the calculation package, and the clause reference where a number came from a published rule.

Send a set

The earlier we are involved, the more of your structure is still worth optimising.

We reply within one working day.